• +91 - 88888 67522 / 77200 33758 / 94231 66885

Floor Screed Application at container loading Jetty

At one of the leading campus in Mumbai, the existing floor at Jetty was repaired using floor screed FS-9. It involved preparation of surface, applying primer, laying the floor screed FS-9, applying the top coat and making the floor ready to use in 3-4 working days.

Fixing of Industrial Tiles
Fixing of Industrial Tiles
Industrial Tiles Solutions

Industrial Tiles Solutions
Industrial Tiles Solutions


request-quote