Floor Screed Application at container loading Jetty
At one of the leading campus in Mumbai, the existing floor at Jetty was repaired using floor screed FS-9. It involved preparation of surface, applying primer, laying the floor screed FS-9, applying the top coat and making the floor ready to use in 3-4 working days.